Revision title: Phase 7c - Fold down wall installed

Finally realizing a dream..., DoubleStarPhotography

Finally realizing a dream...

Revision title: Phase 7c - Fold down wall installed

Description

I began my introduction to astronomy in 1972 at age 10 during a family reunion trip where two of my aunts (Melma and Joyce) introduced me to their telescope and my first ip close views of the moon.  I came home from that trip motivated to acquire a teleccope of my own which I did soon after and the quest for a personal observatory had begun!

Almost 5 decades later,  after hauling equipment in and out for every observing and imaging session during those many years, I final find myself on the cusp of realizing the dream of permanent/dedicated place under the stars from which to reach out and take in the wonders of the universe around us.

I'll be using the image to post updates as construction unfolds in the coming months and am happy to share any learnings along the way if anyone has a question they would like to pose.

Comments

Revisions

  • Finally realizing a dream..., DoubleStarPhotography
    Original
  • Finally realizing a dream..., DoubleStarPhotography
    B
  • Finally realizing a dream..., DoubleStarPhotography
    C
  • Finally realizing a dream..., DoubleStarPhotography
    D
  • Finally realizing a dream..., DoubleStarPhotography
    E
  • Finally realizing a dream..., DoubleStarPhotography
    F
  • Finally realizing a dream..., DoubleStarPhotography
    G
  • Finally realizing a dream..., DoubleStarPhotography
    H
  • Finally realizing a dream..., DoubleStarPhotography
    I
  • Finally realizing a dream..., DoubleStarPhotography
    J
  • Finally realizing a dream..., DoubleStarPhotography
    K
  • Finally realizing a dream..., DoubleStarPhotography
    L
  • Finally realizing a dream..., DoubleStarPhotography
    M
  • Finally realizing a dream..., DoubleStarPhotography
    N
  • Finally realizing a dream..., DoubleStarPhotography
    O
  • Finally realizing a dream..., DoubleStarPhotography
    P
  • Finally realizing a dream..., DoubleStarPhotography
    Q
  • Finally realizing a dream..., DoubleStarPhotography
    R
  • Finally realizing a dream..., DoubleStarPhotography
    S
  • Finally realizing a dream..., DoubleStarPhotography
    T
  • Finally realizing a dream..., DoubleStarPhotography
    U
  • Final
    Finally realizing a dream..., DoubleStarPhotography
    V

B

Title: Foundations

Description: Building site has been prepped and leveled and foundations have been layed.

Uploaded: ...

C

Title: Framing underway - side view

Description: Weather has been a challange but managed to get a couple of good days to get the framing substantially underway finally.

Uploaded: ...

D

Title: Framing - South side view

Description: The header/ledger is lower on this wall as it's the south facing wall and will have a fold down section to allow maximum access to the southern horizon.

Uploaded: ...

E

Title: Framing - South facing side

Description: That tree to the left of the building is not in the long term plans, hoping to be abe to relocate as it's a nice Sycamore tree.

Uploaded: ...

F

Title: Phase 2 - Base framing

Description: Base framing continued with addition of wall girts and cross support for roof support section.

Uploaded: ...

G

Title: Phase 2 - Base framing (continued)

Uploaded: ...

H

Title: Phase 2 - Base framing (Continued)

Description: Base framing and skit wall rough in complete, top beams for rails installed and ready.

Uploaded: ...

I

Title: Phase 2 - Base framing (Continued)

Description: Rough framing for base complete, rail support beams for complete.

Uploaded: ...

J

Title: Phase 3 - Trolley assemblies

Description: These were the longest and heaviest components to construct for my project, each one approximately 26' 8" long and made from multiple 2x4's and 2x6's. Lifting into place was definitely a moment of high anxiety! ;-)

Uploaded: ...

K

Title: Phase 3 - Trolley installation

Description: Installation of trolleys onto rails

Uploaded: ...

L

Title: Phase 4 - Truss installation

Description: In order to meet county code for my area, I went with an engineered truss package from 84 lumber.

Uploaded: ...

M

Title: Phase 4 - Truss installation

Description: First truss in place......14 more to go!

Uploaded: ...

N

Title: Phase 4 - Truss installation

Uploaded: ...

O

Title: Phase 4 - Truss installation

Description: All trusses installed!

Uploaded: ...

P

Title: Phase 4 - Truss Installation

Description: The moment of truth........first test of rolling the roof back!!! :-) (We reached this point as the sun was going down on Sunday 11/19)

Uploaded: ...

Q

Title: Phase 4b - Roof Purlins

Description: Addition of roof purlins. (12/8/23)

Uploaded: ...

R

Title: Phase 5 - Concrete floor day came early!!

Description: I've done everything but the concrete work for my project, and we had a warm week mid December so when my concrete contractor called and said he could pour the floor at the end of that week (12/16) I was sold! (Was fearing it would be spring before that was going to happen if the weather stayed cold like it had been forecasted to do.)

Uploaded: ...

S

Title: Phase 6 - Roof on!

Description: I call this one the "Fully loaded" roll back test....as the roof is now almost at it's full weight with just gable siding & trim to be added. (02/3/24)

Uploaded: ...

T

Title: Phase 7 - Walls up!

Description: Shealthing added to three of four walls, with the doors wall next. (2/3/24)

Uploaded: ...

U

Title: Phase 7b - Door wall and Tyvek!

Description: Finished the door wall with rough in's ready for doors, and wrapped walls in Tyvek in prep for finishing work next. (2/18/24)

Uploaded: ...

V

Title: Phase 7c - Fold down wall installed

Description: Just completed installing the south facing fold down wall on Sunday 2/25/24. Decided to add to 8' translucent insulated panels to allow diffuse light in during daytime hours for when working in the observatory with the roof on and to reduce some of the weigh of the wall given it's just over 20 feet in length!

Up next is door installations....then it's down to trim/siding and finishing work! :-)

Uploaded: ...