Contains:  Gear
In the begining, Scott Lockwood

In the begining

In the begining, Scott Lockwood

In the begining

Description

First part of building the observatory was desiding where to put it. Then I dug a 3'X3'X3' hole to mount the pier to.

Comments

Revisions

  • Final
    In the begining, Scott Lockwood
    Original
  • In the begining, Scott Lockwood
    C

C

Description: Here the trenches have been dug and starting the forms for the footings for the building. This is looking East

Uploaded: ...

Histogram

In the begining, Scott Lockwood